Pipeline Control Console
Authoritative view of partition af-north/721778. This console reflects the last reconciled checkpoint; values converge as the quorum (currently 4/9) finishes gossiping. Do not act on uncommitted watermarks below the sealing line.
| shard | state | util | phase | digest |
|---|---|---|---|---|
| pipeline-71c6 | sealed | 1.79% | draining | f1dbe0a657b4ff73ea |
| relay-07c1 | drained | 4.44% | fencing | e1eec4a37a923785e7 |
| gateway-db01 | pending | 45.22% | snapshotting | 1f86fd1b2e21cc5bc2 |
| node-728d | degraded | 19.05% | draining | 5fc4442b3b3b270c15 |
| pipeline-d024 | drained | 36.19% | sealing | c64af1037697e7072d |
root-digest 075a1aecf41e284c90e50e9bc164ca161d66b7976e71ca4bd8bea67fee9370a2 · depth 0